| Cienfuegos Oil Mill |
|
|
|
| Escrito por Tayli R. Sánchez Zúñiga | |||||||
| Lunes, 02 de Noviembre de 2009 10:23 | |||||||
|
It was built in the 80´s. it began functioning in 1991 in an alternative way until 1995, when the Cuban government decided to quit using it for refining oil but to make it work in receiving and distributing fuel. The "Camilo Cienfuegos" Oil Mill was paralyzed in 1995 and restarted its functions in December 2007, as a result of the cooperation between Cuba and Venezuela through the Bolivarian Alliance for the American Nations (Spanish ALBA).Its reactivation is the result of an association between PDVSA (branch of Petróleos de Venezuela) and CUPET (branch of the Cuban Oil Enterprise), which began inspecting the facilities in the first semester of 2005. Since its reopening 2 years ago, it receives an average of 64 vessels a year, so the provincial harbor’s structural framework has been modified. Cienfuegos Oil Mill will process 65 thousand barrels a day in its first stage and it is estimated that in the second stage the amount will rise up to 109 thousand barrels; for this purpose an enlargement process is being carried out.
Powered by !JoomlaComment 3.26
3.26 Copyright (C) 2008 Compojoom.com / Copyright (C) 2007 Alain Georgette / Copyright (C) 2006 Frantisek Hliva. All rights reserved." |
More
Reflections
| Fidel Castro: Message to the Cuban Youth Fidel Castro Ruz For 57 years, two generations of Cubans, that which preceded us and ours, which led both from the First of January 1959 until today, have fought against the most powerful empire ever known to mankind. |
| Previous reflections |
Survey
Usuarios en línea
Usuarios conectados: 231Contact us quickly
Este sitio está optimizado para todos los navegadores, excluyendo el Internet Explorer v6.0.x
Siempre que utilice nuestras informaciones cite la fuente. Copyright © 2009 --- ISSN 1605 - 2277
Elaborado y diseñado por: Ing. Laynoll Diaz Martinez. --- Asesoría web: Lic. Sabdiel Batista.
J´Grupo Internet: Lic. Ildefonso Igorra. --- Traductora: Lic. Leyaní Díaz.
Directora General: Lic. Alina Rosell. --- Subdirector Informativo: Lic. Héctor R. Castillo.





Savings for 500 000 to 600 000 dollars a month are being achieved by Camilo Cienfuegos Oil Mill by carrying out several of its processes using waste fuel gas instead of fuel oil, which holds high prices in the international market.